William Norris, 'Norwegian Supreme Court: Norsk Retstidenda 2011' (2012) 20 European Review of Private Law, Issue 4, pp. 1159–1163

Abstract

Abstract: This article summarizes the main issues typically arising as regards the building and operation of onshore wind farms in the United Kingdom. It looks at both the planning process and the potential for a private law action, even though planning permission has been granted and a wind farm is operating within the conditions imposed by that process. The issues arising in a typical (and particular) private law action are considered.

Résumé: La présente note résume les principales questions qui se posent au sujet de la construction et la mise en opération de parcs d'éoliennes sur terre ferme au Royaume Uni. Il analyse á la fois le processus de planification et le potentiel d'une action en droit privé même si les permis de bâtir ont été garantis et les éoliennes sont opérantes dans les conditions imposées dans ce processus. L'article prend en considération les questions qui se posent dans une action type (et particuliére) en droit privé.

Zusammenfassung: Der vorliegende Beitrag fasst die zentralen Probleme, die in Großbritannien im Zusammenhang mit dem Bau und Betrieb von Windparks im Inland typischerweise aufkommen, zusammen. Er betrachtet dabei sowohl den Planungsprozess als auch das Potenzial für private Rechtsstreitigkeiten, auch für den Fall, dass eine Baugenehmigung erteilt wurde und der Windpark innerhalb der in diesem Zusammenhang beschlossenen Auflagen operiert. Die sich ergebenden Probleme eines typischen (aber auch speziellen) privaten Rechtsstreits werden berücksichtigt.

Copyright © 2012 Kluwer Law International
All rights reserved

ISSN: 0928-9801
ID: ERPL2012070